The new 12,014 SF Reclaimed Water Facility was designed with the capacity to produce one million gallons of reclaimed water per day. The new building houses a micro-filtration membrane system, ultraviolet radiation system, pumping and piping systems, and chemical facility. The project also included a precast concrete water storage tank, yard utilities, roadways, plumbing, heating, ventilating, air conditioning, building automation systems, lighting, and an electrical system associated with the building and processing system. A 4,000 line feet buried pipeline connecting the Reclaimed Water Facility and the Central Utility Plant was installed across the campus, and included a pipeline for irrigating adjacent Sherman Field.