This project included three additions to the Library totaling 24,000 SF, as well as the complete interior renovation of the existing facility.  The project faced several unique challenges: relocating underground utilities that serve the Library and the adjacent Farmington High School without affecting school operations; building an engineered shoring system for bank stabilization; demolishing and/or shoring the existing exterior precast concrete walls at interfaces with the additions.