Responding to the need for temporary power in Fairfield County, Connecticut, the Connecticut Municipal Electric Energy Cooperative (CMEEC) retained O&G as the EPC Contractor to provide 22 MW of peaking power to their existing power station, located in Norwalk. This fast-track project was completed in less than two months and required extensive site work and sound attenuation, upgrading the existing switch yard, interconnecting site utilities and managing the turbine installation. All work was completed without taking the existing facility offline.